Dell Z9100-ON Kurulum Kılavuzu - Sayfa 22

Anahtar Dell Z9100-ON için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell Z9100-ON 45 sayfaları. Open networking
Ayrıca Dell Z9100-ON için: Kurulum Kılavuzu (45 sayfalar), Kurulum Kılavuzu (43 sayfalar)

Dell Z9100-ON Kurulum Kılavuzu
Figure 11. Two-post center-mount configuration
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, item 2.
3. Repeat this procedure for the second rail.

Four-post threaded configuration

CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in
Step 1.
1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver, item 1.
Retain the latch castings for future rack requirements.
22
Z9100–ON installation