Miele DA 230-3 Çalıştırma ve Kurulum Talimatları - Sayfa 29
Havalandırma Davlumbazı Miele DA 230-3 için çevrimiçi göz atın veya pdf Çalıştırma ve Kurulum Talimatları indirin. Miele DA 230-3 32 sayfaları. Ventilation system
^ Bolt the flange firmly to the ceiling us-
ing the four M6 nuts.
^ Shorten the power cord as much as
possible and attach it to the terminal
block inside the chimney (see "Elec-
trical data").
Before connecting the appliance
read the "Warning and Safety In-
structions" and the "Electrical data"
sections.
^ Finally, being careful not to scratch
the chimney, push the cover plate up
and onto its locking pins until it clicks
into place. If installed correctly, the
cover should be secure and flush
against the ceiling.
^ Before using the appliance remove
the grease filter and remove the pro-
tective foil from the filter frame. Re-
turn the filter.
29