Miele PDR 518 Çalıştırma ve Kurulum Talimatları - Sayfa 19
Kurutucu Miele PDR 518 için çevrimiçi göz atın veya pdf Çalıştırma ve Kurulum Talimatları indirin. Miele PDR 518 38 sayfaları. Commercial tumble dryers
Ayrıca Miele PDR 518 için: Çalıştırma ve Kurulum Talimatları (36 sayfalar)
Risk of injury or damage to property due to improper
installation.
Incorrect installation of the tumble dryer can lead to personal injury
or damage to property.
Before commissioning the tumble dryer for the first time, make sure
it has been installed correctly.
Connect the tumble dryer correctly.
Please observe the instructions in "Installation".
Complete the initial commissioning process. During the initial
commissioning process, you will need to define the settings for daily
use of the tumble dryer. Some settings can only be modified during
the initial commissioning process. After that, they can only be
changed by Miele Professional Service.
Using for the first time
19