360 Yield 360 Y-DROP NEW HOLLAND Kullanım Kılavuzu - Sayfa 6

Çiftlik Ekipmanları 360 Yield 360 Y-DROP NEW HOLLAND için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. 360 Yield 360 Y-DROP NEW HOLLAND 12 sayfaları.

PRE-2008 CENTER SECTION
III.
SQUARE TUBE INSTALLATION
Figures 8 and 9
Step 1
Install bolts (1) over the OEM center
section boom.
Step 2
Place 14" top plates (2) and bracket
assembly (3) into position and install 3/8"
flange nuts (4).
Step 3
Install extension tube (5) onto bracket
assembly (3).
Step 4
Install carriage bolts (6) and the
flange nuts.
Figure 10
Step 5
Install drop tube (1) onto the extention
tube and install stop bolt (2).
Hardware Kit B
Repeat steps 1-5 for the other center section mount.
INSTRUCTIONS 360 Y-DROP
5
3
Figure 8
5
3
3
Figure 9
Figure 10
MILLER
NEW HOLLAND
2
1
6
4
2
4
6
3
6
4
4
6
2
1
6