HP 3000 Series Yükseltme Kılavuzu - Sayfa 15
Masaüstü HP 3000 Series için çevrimiçi göz atın veya pdf Yükseltme Kılavuzu indirin. HP 3000 Series 19 sayfaları. 9x9 to k class conversion
Ayrıca HP 3000 Series için: Manuel (25 sayfalar), Manuel (20 sayfalar), Kurulum Kılavuzu (42 sayfalar)
CPU Upgrade
Installation Verification
Installation Verification
Before performing the procedures in this section, make sure that all cover plates removed are reinstalled
and secure. This is for proper seating of the cards, as well as, cooling requirements.
1. Connect the power cord to the rear of the computer.
2. Insert the computer key into the switch and turn it to the ON position.
3. Observe the Front Panel Display and Console for any error or fault (FLT) messages (see CPU Fault
Messages). Verify the number of CPUs shown in the Front Panel Display.
4. When the console displays the following message:
To override, Press any key within 10 seconds
Press a key to interrupt boot.
5. The PDC Main Menu will be displayed (the appearance of the menus may vary slightly, depending
upon your installed version of the PDC):
-------- Main Menu ---------------------------------------------
Command
BOot [PRI|ALT|<path>]
PAth [PRI|ALT|CON|KEY] [<path>]
SEArch [DIsplay|IPL] [<path>]
COnfiguration menu
INformation menu
SERvice menu
DIsplay
HElp [<menu>\<command>]
RESET
---------
Main Menu: Enter command or menu > in
10
Description
Boot from specified path
Display or modify a path
Search for boot devices
Displays or sets boot values
Displays hardware information
Displays service commands
Redisplays the current menu
Display help for menu or command
Restart the system