Miller Cool Runner 3CS Kullanıcı El Kitabı - Sayfa 11
Kaynak Sistemi Miller Cool Runner 3CS için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Miller Cool Runner 3CS 20 sayfaları.
Ayrıca Miller Cool Runner 3CS için: Kullanıcı El Kitabı (24 sayfalar)
5-1. Installation
4
6-1. Operation
1
Front Of Cooling Unit
SECTION 5 − INSTALLATION
3
2
4
1
SECTION 6 − OPERATION
4 or
3
2
5
6
Tools Needed:
1
Coolant Tank Cap
2
Coolant In Fitting
3
Coolant Hose (Customer Supplied -
Not Required On All Models)
4
TIG Block Or International Style Water
Adapter (Customer Supplied - Varies
By Model)
Connect coolant hose between Coolant In fit-
ting and TIG block located on welding power
source Electrode weld output terminal, or
connect international style water adapter to
Electrode weld output terminal and adapter
water hose to Coolant In fitting.
5
Coolant Out Fitting
Connect hoses between cooling unit and
torch cable/TIG block coolant fittings.
NOTICE − If welding power source has a wa-
ter valve, do not connect hoses to water
valve.
See Section 4-3 to select proper coolant, and
fill tank. Keep coolant level full.
Operation:
6
Flowmeter
805 102-B / 805 517-A
To turn cooling unit On, connect power cord
to welding power source 115 volts ac recep-
tacle. Unplug to turn unit Off.
Flow indicator spins to indicate that at least
1.1 qt/min (1.0 L/min) of coolant is flowing.
Tools Needed:
11/16 in.
1
Base
Secure base to power source.
2
Bottle Support
3
Chain
Secure bottle support to power
source.
Connect chain to bottle support.
4
Universal Handle
Secure handles to power source.
3/8 in.
805 139-C
9/16 in.
OM-230 161 Page 7