Miller CP-252TS Kullanıcı El Kitabı - Sayfa 21

Kaynak Sistemi Miller CP-252TS için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Miller CP-252TS 32 sayfaları.

2-14. Placing Jumper Links And Connecting Input Power

200 VOLTS
L1
L2
L3
220 VOLTS
L1 L2 L3
380 VOLTS
L1 L2 L3
575 VOLTS
Y Always connect
grounding conductor first.
= GND/PE
3/8, 1/2 in
2
230 VOLTS
L1
L2
L3
400 VOLTS
L1 L2 L3
520 VOLTS
L1 L2 L3
THIS MACHINE DOES NOT REQUIRE
SUPPLIED JUMPER LINKS.
1
4
L1
L2
L3
3
Check input voltage available at
site.
1
Check label – only one is on unit.
2
Move jumper links to match input
voltage, and label on unit.
3
460 VOLTS
See Section 2-13.
L1
L2
L3
4
S-072 135-B
See Section 2-13.
440 VOLTS
Close access door.
L1 L2 L3
S-177 581
S-177 582
S-183 223
Jumper Link Label
Jumper Link
Input And Grounding
Conductors
Line Disconnect Device
ST-801 382
OM-259 Page 17