Miller RUNNING GEAR Operatör El Kitabı - Sayfa 4

Kaynak Aksesuarları Miller RUNNING GEAR için çevrimiçi göz atın veya pdf Operatör El Kitabı indirin. Miller RUNNING GEAR 22 sayfaları.

Miller RUNNING GEAR Operatör El Kitabı
PRE-DELIVERY CHECK LIST
After the Running Gear has been completely
set-up, check to be certain it is in correct running
order before delivering it to the customer. The
following is a list of points to inspect. Check off
each item as you have made the proper
adjustments and found the item operating
satisfactorily. Any adjustment must be made
according to specifications defined in this manual.
[] All grease fittings have been lubricated. See
"Lubrication" section in this manual.
[] All mechanisms are operating trouble free.
[] All bolts and other fasteners are tight and
torqued per torque specifications. Page 6.
Dealer's
Name
Signature of Pre-Delivery Inspector
Date of Inspection
Model No.
Serial No.
RUNNING GEAR
DELIVERY CHECK LIST
The following check list is an important
reminder of valuable information that MUST be
passed on to the customer at the time the unit is
delivered. Check off each item as you explain it to
the customer.
[] Give the customer his Operator's Manual.
Instruct them to be sure to read and completely
understand its contents BEFORE attempting to
operate the unit.
[] Explain the warranty.
[] Explain and review with the customer the
Safety Precautions section of this manual.
[] Explain and review with the customer the
Operating and Safety Equipment section of this
manual.
[] Explain that regular lubrication and proper
adjustments are required for continued proper
operation and long life. Review with the customer
the Maintenance and Adjustments sections of this
manual.
[] Complete the Delivery Registration Card and
have customer sign it and return it to Miller-St.
Nazianz, Inc.
I acknowledge that above points were reviewed
with me at the time of delivery.
Customer's Signature
Date Delivered
2
(Customer Copy)