Miller Soft Start 2 Kullanıcı El Kitabı - Sayfa 16

Kaynak Aksesuarları Miller Soft Start 2 için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Miller Soft Start 2 24 sayfaları. Om-189 112

Miller Soft Start 2 Kullanıcı El Kitabı
B. Power Connections to a Maxstar 91 or 152 Welding Power Source
NOTE
Parts needed for this procedure are
supplied with the high-frequency unit.
Tools Needed:
OM-189 112 Page 12
Be sure that the Soft Start is a 230 VAC model.
Internal connections cannot be made to a
Maxstar 175 for input power.
1
4
5
3
2
1
Welding Power Source
Remove wrapper.
2
Snap-In Blank
Remove blank and install supplied
bushing into hole.
3
Control Relay CR1
4
Plug PLG11
PLG11 is secured in a lead bundle
near control relay CR1. It may be
necessary to remove cable tie to
access PLG11.
5
Protective Blank
Remove blank from PLG11.
Position welding power source
above high-frequency unit, and
route RC11 through bushing in
welding power source case bottom.
Connect plug PLG11 to receptacle
RC11. Use cable ties to secure
leads to lead bundle in welding
power source so leads are away
from fan blade.
Reinstall welding power source
wrapper.
Install mounting brackets accord-
ing to Section 3-4.