Aquapeutics Mazatlan Kurulum Kılavuzu - Sayfa 7

Sıcak Küvet Aquapeutics Mazatlan için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Aquapeutics Mazatlan 15 sayfaları.

MODEL:Mazatlan Installation instructions:
A Water supply:
Hot and cold water supply lines are half inch NPT pipe thread
Power supply : A 220Volt , 1 3 amp service with GFI is necessary to energize the steam room-spa and
a 110 volt 11.8 amp circuit with GFI is needed for the whirlpool bath. Please note: If you have
purchased aTub with the additional heater option it is very important to understand that the
electrical requirements for your unit have changed. The heater requires a second separate electrical
circuit that can supply13 amps at 110 volts with GFI in addition to what your tub had originally
needed.
B The size of breakers and wire gages needed is determined by local, state and national codes as
interpreted by the installing electrician. The length of the wire going to the steam generator from the
wall should be 5 feet, while the length of the telephone line needed is 7 feet. This allows the unit to
be pulled out from the side walls if maintenance is ever needed.
C . D rainage: The diameter of the drain pipe needs to be at least 2 inches. The position of the drain
hole can be within 6 inches from the hole shown in the drawing. It is also very important that the
drain line not have a trap. It must be a straight drain line, as the shower-spa has its own built in
trap for your convenience.
Notes:
(1) The distance from thetop of the steam room to the ceiling of the area where it is installed should
be 4 inches or greater. (The room should be at least 4 inches taller than the spa.)
(2) It is recommended that the water pressure be at least 43 PSI and both the cold and hot water
pressure should be as equal as possible. If the pressure is lower than required, have your plumber
install the necessary equipment to increase the water supply pressure.
(3) Please have ground fault interrupter (GFI) protection on all power supply lines to the spa.
(4) It is easier to line up all panels with the hardware loose. During initial assembly please attach all
fasteners loosely, then when the unit is completely erected, snug up all bolts and screws.
Step 1
1.
Place the shower / tub floor
unit (as pictured to the right)
16-24 inches from its final
installed location. Now
adjust the leveling feet to
bring the unit flat and level
by using a 3 foot level and
an open end or adjustable
wrench to turn the adjusting
nuts. (2 shown of 4) This will
raise or lower each corner as
needed. Once the unit is level
and flat lock each leg into
.
position with its locking nut