AquaPRO PRO100120 Kullanıcı El Kitabı - Sayfa 4
Üfleyici AquaPRO PRO100120 için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. AquaPRO PRO100120 8 sayfaları. Spa blower
Ayrıca AquaPRO PRO100120 için: Kullanıcı El Kitabı (4 sayfalar)
Operating Instructions
Hartford Loop required if Blower is more
than 25 feet away from pool / spa
Alternate location for check valve if
Harford Loop is used
Grade
12 inch minimum
Figure 1
Installation
Guidelines
(Continued)
blower to the supply line. Glue fumes
can potentially cause an explosion
when the blower starts. Install a 1/4"
self-tapping screw to secure the joint if
necessary.
blower below water level. Blower
must be at least one foot above the
maximum water level.
4. Mount blower in a vertical position
using vertical rigid PVC pipe as
shown in Figure 1. For additional
support use supplied bracket as
shown in Figure 1. For warm
climates, try to locate the blower in
a shaded location.
is to be installed more than 25 ft from
the spa, it will be necessary to install a
loop that is 1 foot above the water line
and as close to the spa as possible (See
Figure 1).
check valve must be installed at least
1-877-AQUASYS
5 Foot minimum from water
(use non-metallic plumbing)
Non-metallic
electrical tubing
Mount using rigid PVC pipe. For additional support, use supplied bracket as shown.
one foot above the water level when
supercharging water jets.
5. Verify plumbing is free of leaks
Do not
before adding water to spa.
glue the
6. Do NOT install adjustable jets.
Adjustable jets can cause excessive
back pressure within the unit.
7. Hydrotherapy jets naturally aerate
when installed correctly. Do not use
Do not
install
blower to supplement aeration
when jets have been installed
incorrectly.
Wiring Guidelines
wiring instructions, could result in
death or serious injury.
If the
and electrical connections must be
blower
performed by a qualified electrician.
Installations must be in accordance
with local and national codes.
1. For electrical ratings, see product
decal.
2. Check the line voltage to make
A loop
and a
certain it is correct for the blower
being used. Do not attempt to
Conduit box and cover
24 inches above
surrounding
grade / 12 inch
minimum above
water
Air flow
Failure to
observe
All
wiring
2
Orient blower
housing as shown
Bracket
Check valve
(location when
NOT using a
Hartford Loop)
Rigid PVC pipe
connect 240 VAC to a 120-volt
blower; it will damage the blower
and void the warranty.
3. Refer to the National Electric Code
Guidelines for wire size and to
prevent electric shock.
4. Refer to the National Electric Code
Guidelines for proper selection of
wiring conduit and strain relief.
5. The blower field-wiring box is
designed for non-metallic electrical
tubing only. Refer to the National
Electric Code Guidelines for proper
selection of wiring, and strain
relief.
6. Be certain to connect the green
ground wire supplied with the
blower to the ground from
your electrical panel.
7. Connect remaining line wires
individually to the remaining wires
in the blower.
8. When wiring is complete carefully
install gasket and conduit cover
plate.
Overheating, short-circuiting and fire
damage will result from inadequate
wiring.
www.aquaprosystems.com
Wall or post