Burlington B10ES Hızlı Başlangıç Kılavuzu - Sayfa 2

Banyo Armatürleri Burlington B10ES için çevrimiçi göz atın veya pdf Hızlı Başlangıç Kılavuzu indirin. Burlington B10ES 2 sayfaları. Roll top basin stand

3
For the height requirement,
if necessary the pipes can
be cut at this end.
6
7a
Before installing onto the wall, ensure the 2 bottom feet
have been inserted.
4
Place the basin in position, check for level.
7
After level, position the basin bracket against the wall, to
support the basin weight (see diagram below), mark the
fixing holes position onto the wall.
Drill holes, insert rawl plugs, fix the basin bracket onto the
7b
wall. (Rawl plugs, screws are not supplied in the box)
2 - 2
5
Ø8mm
4x
Place the basin in position ensuring that it is level.
8
The basin must be fixed to the wall using the
supplied basin brackets or other appropriate method.
Optional:
Silicone is advised
to spread at the top
of the adjustment
head.
B