Aquasana AQ-UV-10C Çalıştırma ve Kurulum Talimatları - Sayfa 10
Su Filtrasyon Sistemleri Aquasana AQ-UV-10C için çevrimiçi göz atın veya pdf Çalıştırma ve Kurulum Talimatları indirin. Aquasana AQ-UV-10C 16 sayfaları. Whole house uv filter
Ayrıca Aquasana AQ-UV-10C için: Kullanıcı El Kitabı (20 sayfalar)
Step 3: At a water outlet, run the water until bleach can be smelled. Repeat this for
all faucets, toilets, shower heads, refrigerators, outdoor taps, the washing machine,
dishwasher, etc. at the home or facility. Once finished, wait a minimum of 30
minutes before continuing.
Step 4: Reinstall the filter cartridge into the sump and flush the chlorine solution
by opening all faucets until chlorine can no longer be detected. Your home has now
been completely disinfected with your Aquasana UV system ready to inactivate any
microorganisms that enter the home.
Cleaning the Quartz Sleeve
Depending on the water quality, the quartz sleeve may require periodic cleaning. At
a minimum, the quartz sleeve should be cleaned on an annual basis. The following
steps outline a basic cleaning procedure.
Step 1: If a by-pass assembly is installed, shut the inlet valve off to prevent water
flow through the system. Otherwise, turn off main water inlet valve (and/or turn off
the water pump).
Step 2: Disconnect power cord of UV system from electrical outlet.
Step 3: Release water pressure by opening a downstream faucet and then close the
outlet shut-off valve (if one is installed). If there is no outlet shut-off valve, expect
water to drain from the system as the head pressure in the system will cause the
water to flow back down.
Step 4: Remove the captive ground screw from the ground lug on the UV reactor.
Step 5: Remove the lamp connector from the reactor (gland nut) by pushing the
lamp connector in and turning it ¼ turn counter-clockwise. Disconnect the lamp
connector from the lamp. CAUTION: the lamp may be hot!
Step 6: Being careful to touch only the ceramic ends, carefully remove the lamp out
of the reactor.
Step 7: Unscrew the gland nut from the reactor exposing the end of the quartz
sleeve.
Step 8: Remove the quartz sleeve and o-ring by gently twisting and pulling the sleeve.
Step 9: Using a soft, lint-free cloth or towel wipe the sleeve down using a
commercial scale cleaner (i.e. CLR
or LIME-A-WAY
). This removes scaling or iron
®
®
deposits that may be on the outside of the quartz sleeve. Be careful not to get any
moisture or liquids inside of the sleeve.
Step 10: Dry the sleeve with separate cloth.
Step 11: Replace the o-ring and slide the sleeve back into the reactor following step
6 and 7 from the installation section of the manual.
10