Biomorph Level 2Plus Manuel - Sayfa 11
İç Mekan Mobilyaları Biomorph Level 2Plus için çevrimiçi göz atın veya pdf Manuel indirin. Biomorph Level 2Plus 13 sayfaları.
Cable Diagram Level 2Plus Corner
IMPORTANT:
All cables must be tacked up and made neat with supplied cable guides. NO cables may hang down ex-
cept those passing through cable chains. Make sure cables have enough slack between surfaces to allow
full height adjustment between surfaces.
IMPORTANT:
Extend desktops to full opposite heights to ensure that cables will travel w/o stress).
POWER CABLE
Connect power cables to power
strips inside cable cabs.
CABLE CAB
(Optional) Place door towards user.
LONG CABLES
Use LONG cables to connect both
legs to ports #1 & #2 in controller box.
CABLE TRACKS
Red FRONT surface
Blue REAR surface
SWITCH
for FRONT surface use long 45˚ angle bracket.
Control switches connect to port A1.
2 PORT CONTROLLER
box for FRONT surface
LONG CABLE/
FRONT LEG
POWER CABLE
SWITCH
LONG CABLE/
FRONT LEG
11
GROMMET HOLE
Place grommet into
grommet hole. Route
cable accordingly.
l
WIRE CLIP
A wire clip MUST be placed directly
behind switch to prevent cable droop