Alpha ESS M4856-P Hızlı Kurulum Kılavuzu - Sayfa 4
Kamera Aksesuarları Alpha ESS M4856-P için çevrimiçi göz atın veya pdf Hızlı Kurulum Kılavuzu indirin. Alpha ESS M4856-P 7 sayfaları. Battery module
Drilling Hole
Step4
Push the battery firmly against the wall and use a level to
A
confirm the position of the battery.
B
Please drill four holes (two on each side) directly on the
wall at the marking positions of the brackets with an impact
drill (bit φ 8.0mm, length 20cm) and the depth of each hole
should be about 7 cm.
Note:
1:Check installation space.
2:Pack the PE bag on the battery to block out the dust before drilling.
Mounting Fixed Panel
Step5
A
Insert the expansion tube into the drilled hole.
B
Insert the expansion screw through the gasket and
lock with a screwdriver.
C
Pull off the buckle located in the middle of the bottom.
2
90cm
PE Protective bag ( X 1)
195cm
650cm
4
5
Screw package:
Expansion tube (X 4)
Expansion screw (X 4)
Gasket (X 4)