Alpha ESS Backup Box V02 Hızlı Kurulum Kılavuzu
Güç Kaynağı Alpha ESS Backup Box V02 için çevrimiçi göz atın veya pdf Hızlı Kurulum Kılavuzu indirin. Alpha ESS Backup Box V02 2 sayfaları.
Alpha ESS Co., Ltd.
+86 513 806 068 91
www.alpha-ess.com
JiuHua Road 888, Nantong High-Tech Industrial
Development Zone, Nantong City, 226300
Alpha ESS Europe GmbH
+49 610 3459 1601
www.alpha-ess.de
Paul-Ehrlich-Straße 1a, 63225 Langen, Hessen
Alpha ESS Australia Pty. Ltd.
+61 402 500 520 (Sales)
+61 1300 968 933 (Technical Support)
www.alpha-ess.com.au
Suite 1, Level 1, 530 Botany Road, Alexandria,
NSW, 2015
Alpha ESS UK Co., Ltd
Drake House, Long Street, Dursley, gl11 4hh
SUMMARY
01
SUMMARY
The backup box is a product of AlphaESS for switching on and off the grid.
1.1. Parts List
Check the following parts list to ensure the package is complete.
A complete backup box system consists of:
Name
1 transfer 3 cable (for
L
SMILE5/SMILE-B3)
1 transfer 2
communication
connector
Meter patch cable
for backup box
Installation manual
Terminal
Cylindrical fuse
Fuse holder
Note: 1. Meter patch cable for backup box is different from backup patch cable for
backup box. Meter patch cable for backup box must be connected in the correct
place as the diagram shows.
2. We will install the cylindrical fuse in the fuse holder before shippment. Please
install the fuse part when installing the Backup Box.
Alpha ESS Suzhou Co., Ltd.
+86 512 6828 7609
www.alpha-ess.com
Level 15,SIPC 158 Wangdun Road SIP Suzhou,
215028
Alpha ESS Italy S.r.l.
+39 599 239 50
www.alpha-ess.it
Via Loda,17-41013 Castelfranco Emilia(MO)
Alpha ESS Korea Co., Ltd
+82 64 721 2004
2F, 19-4, Nohyeong 11-gil, Jeju-si, Jeju-do,
Republic of Korea
Illustration
Quantity
GRID_L1
GRID_L2
GRID_L3
QUICK INSTALLATION MANUAL
INSTALLATIONMANUAL
ENERGYSTORAGESYSTEM(ESS)
BACKUP BOX
STORION-SMILE-T10(INDOOR)
V02
01
02
1.2 Terminal Diagram
1
2
1
1.3 Technical Specification
Datasheet:
Phase
1
Display
Communication
Operating Temperature Range
25
Humidity
Protection Level
3
Dimension (W x D x H)
Warranty
Nominal Output Power
1
Grid Frequency
Nominal Current
LED Status Indication
LED Display
PF
QF
Fault
ON
COM
OFF
Figure 1: backup box Terminal Diagram
Single Phase / Three Phase
LCD
RS-485
-20 ºC ~ 60 ºC
15% ~ 85%
IP20
208mm x 67mm x 127 mm
5 Years
20 kW
50/60 Hz
30 A *3
Description
Active Power
Reactive Power
Communication Lost/Relay
SUMMARY