die-schaukel.de LMBG B 82.10:2002 Doğru Kullanım, Bakım ve Montaj Talimatları - Sayfa 5
Bebek Salıncağı die-schaukel.de LMBG B 82.10:2002 için çevrimiçi göz atın veya pdf Doğru Kullanım, Bakım ve Montaj Talimatları indirin. die-schaukel.de LMBG B 82.10:2002 6 sayfaları. The multi-child swing for commercial use
Assembly Instruetions
Partslist
I
A. 2 x Impact guard, long, for slde mounting
A
B. 2 x Aluminium pipe, long and curved
C. 2 x Impact guard, lop and bottom
D. 2 x Aluminium pipe, short and straight
E.
1 x Plastic bag with mounting accessories
consisting of 4 x screws, 4 x conle
spacers, 4 x spring washers and 2 x hex
wrenches
F. 1 x Pack of webbing bands
G. 2 x Suspension systems consisting of
ropes, rope-stays (figure eights), and
screws
r:~~~~~~=~~]
lay the parts out exactly as shown in the photo.
~J
,.
~\
Open the pack of webblng bands. First, thread Ihe long bands (part F) onlo the
short piece of pipe (part 0).
Afterwards, pry apart one comer of the Impact guard (part C) with ane hand,
push the short pipe (part 0) into the impact guard and pul! on the bands.
lii~~~~~;~~q
Insert the long pipes (part B) into the impact guard so thai the holes near the
end of the pipes are securely sealed onto the safety pegs when the Impact
guard is squeezed together.
Now Insert a screw, wilh aspring washer as a spacer (convex side up) in each
corner and tighten lhe hex wrench 10 the force of
-15-20
Nm or
10-15
tl-Ib.
Thread the short webbing bands onto the long pipes.
August
2007
Assembly 01 The Multi-ehild Swing for Commercial Use
2