Cinier Greenor Montaj Talimatı - Sayfa 2

Fan Cinier Greenor için çevrimiçi göz atın veya pdf Montaj Talimatı indirin. Cinier Greenor 9 sayfaları. Fan coil

Cinier Greenor Montaj Talimatı
1- Receiving:
Standard delivery content:
- The Greenor
fan coil comes
®
plastic-wrapped and in a heavy-duty card-
board box on a pallet.
A template is included for optimal ease of
installation.
- With the fan coil: two extensible flexible
hoses to connect to the heating system.
- 4 air filters + 1 remote control.
- One cleaning accessory to attach to
the vacuum cleaner for routine cleaning.
Equipment and tools required for installation:
- Raw-plugs, screws and washers selected to hold the weight of the fan coil on the supporting wall
(134.5 lbs / 61 kg)
- Standard fixing and connection tools (elbow fitting 90° male 1/2», flat gaskets...).
Handling and positioning:
(The fan coil must be handled by two persons.)
Use thin rubber gloves to handle the Greenor
Use clean hands or clean thin rubber gloves to handle the panel.
Greenor
fan coil must have at least a 6»/15cm clearance on each side of the panel (floor, ceiling, wall) and at
®
least 20»/50cm in front of the panel.
When positioning the unit, make sure that the air intakes are free from obstructions and far enough from potential
hazards such as curtains.
2 - Preparation:
Removal of the front panel
Remove the 2 clamp-locking screws,
Open both bottom clamps,
Raise the lower section and the 4 filters slightly,
Disengage with a small upward movement.
Before drilling, use the template provided to mark the location of the four fixing holes at the top of the unit and
of the one fixing hole by the bypass valve.
The contractor will decide on the best fixation system to bear the 134,5lbs/61kg weight fan coil.
Secure the rough chassis with adequate wall plugs and screws designed for the bearing wall.
The unit must be handled by two persons.
fan coil.
®