Cisco 12000 GSR Series Referans Materyal - Sayfa 4

Ağ Yönlendiricisi Cisco 12000 GSR Series için çevrimiçi göz atın veya pdf Referans Materyal indirin. Cisco 12000 GSR Series 17 sayfaları.

Cisco 12000 GSR Series Referans Materyal
20614 Cisco Installing and Maintaining Routers Part 4: 12000 GSR Series and XS5032 Modules
Cisco 12000 Series GSR: Troubleshooting
Startup Problems: Identifying (ULT 171): Identify Cisco 12000 Series Gigabit Switch Router (GSR) startup
problems.
Power Subsystem: Troubleshooting (ULT 172): Identify guidelines for troubleshooting the power
subsystem.
Processor Subsystem: Troubleshooting (ULT 173): Identify guidelines for troubleshooting the processor
subsystem.
Cooling Subsystem: Troubleshooting (ULT 174): Identify the guidelines for troubleshooting the 12000
series GSR cooling subsystem.
Cisco 12012: Running Diagnostics (ULT 175): Identify the steps involved in loading and running
diagnostics.
Catalyst 3000 and 5000 Router Modules
Catalyst 3000 Router: Installation
WS−X3011 Router Module: Overview (ULT 212): Identify the characteristics of the WS−X3011 router
module.
Router Card: Installing (ULT 213): Sequence the steps involved in connecting to the router console after
installing the router card.
Router Card: Network Connection (ULT 214): Identify the methods for connecting the router card to a
network.
Router Card: Configuring (ULT 215): Identify the steps involved in configuring the router card.
Catalyst 5000 RSM: Installation
Catalyst 5000 Series Switch Architecture (ULT 221): Identify the characteristics of Catalyst 5000 series
switch architecture.
RSM: Installing (ULT 222): Identify the steps involved in installing the Route Switch Module (RSM).
RSM: Configuring for Inter−VLAN Routing (ULT 223): Identify guidelines for configuring the Route
Switch Module (RSM) for Inter−VLAN routing.
User Interface: RSM Command Modes (ULT 224): Identify each of the Route Switch Module (RSM)
command modes and their access methods.
Catalyst 5000 RSM: Configuring
Session Command: Using (ULT 231): Identify the functions of the session command.
RSM: Booting for the First Time (ULT 232): Identify the phases involved in booting the Route Switch
Module (RSM) for the first time.
RSM: Configuration Task List (ULT 233): Identify the different Route Switch Module (RSM)
configuration tasks for Inter−VLAN routing.
4