To attach a bonding and grounding cable lug to a bonding and grounding receptacle on the router, use
Figure 14
Locate the bonding and grounding receptacle on the router that you plan to use.
Step 1
Position the bonding and grounding cable lug over the bonding and grounding receptacle holes on the
Step 2
chassis.
Insert the two M6 bolts that you removed earlier through the holes in the cable lug and chassis, then
Step 3
install the locking washers and nuts.
Ensure that the bonding and grounding cable does not interfere with other router hardware, then tighten
Step 4
the nuts and bolts to secure the bonding and grounding cable lug to the chassis.
Repeat
Reattaching the Vertical Cable-Management Troughs
To reattach the vertical cable-management troughs, use
Step 1
Align the trough so that the access gate opens toward the front of the chassis.
Align the screw holes on the inside panel of the trough with the standoffs in the chassis rack-mounting
Step 2
flange near the upper horizontal cable-management tray.
Step 3
Use your fingers to insert screws into the two holes and screw them in to hold the trough in place.
Step 4
Insert a Phillips screwdriver through the access holes in the outer panel of the trough and loosely tighten
the two screws.
Step 5
Insert and start screws in the middle two standoffs and the bottom two standoffs.
Step 6
Check the alignment of the trough on all six holes, then use the Phillips screwdriver to tighten all six
screws.
Repeat
Completing the Installation
To complete the installation, follow these steps:
Reconnect power to the power shelf. Refer to the Cisco 12016, Cisco 12416, and Cisco 12816 Router
Step 1
Power System Procedures Guide for detailed procedures.
Reconnect the line card interface cables. Refer to the line card installation and configuration note for
Step 2
detailed instructions.
Reconnect the cables to the RP. Refer to the RP installation and configuration note for detailed
Step 3
procedures.
Reconnect any alarm card cabling. Refer to the Cisco 12016, Cisco 12416, and Cisco 12816 Router
Step 4
Clock and Scheduler, Switch Fabric, and Alarm Card Replacement Instructions for detailed procedures.
78-16082-01
or
Figure 15
as a reference and follow these steps:
Step 2
through
Step 4
for the second bonding and grounding connection, if required.
Step 1
through
Step 6
for the remaining trough.
Cisco 12016, Cisco 12416, and Cisco 12816 Router Chassis Replacement Instructions
Removing and Installing the Chassis
Figure 5
as a reference and follow these steps: