Sony PFV-SP3300 Bakım Kılavuzu - Sayfa 39

Stereo sistemi Sony PFV-SP3300 için çevrimiçi göz atın veya pdf Bakım Kılavuzu indirin. Sony PFV-SP3300 40 sayfaları. Signal processing unit, backup power supply unit
Ayrıca Sony PFV-SP3300 için: Kurulum Kılavuzu (16 sayfalar), Kullanım Kılavuzu (18 sayfalar), Kullanım Kılavuzu (18 sayfalar)

Sony PFV-SP3300 Bakım Kılavuzu
PFV-SP3300
SAFETY CHECK-OUT
After correcting the original service problem,
perform the following safety checks before
releasing the set to the customer :
Check the metal trim, "metallized" knobs, screws,
and all other exposed metal parts for AC
leakage. Check leakage as described below.
LEAKA GE TEST
The AC leakage from any exposed metal part to
earth ground and from all exposed metal parts to
any exposed metal part having a return to
chassis, must not exceed 3.5 mA. Leakage
current can be measured by any one of three
methods.
1. A commercial leakage tester, such as the
Simpson 229 or RCA WT-540A. Follow the
manufacturers' instructions to use these
instruments.
2. A battery-operated AC milliammeter. The
Data Precision 245 digital multimeter is
suitable for this job.
3. Measuring the voltage drop across a resistor
by means of a VOM or battery-operated AC
voltmeter. The "limit" indication is 5.25 V, so
analog meters must have an accurate low-
voltage scale. The Simpson 250 and Sanwa
SH-63Trd are examples of a passive VOM
that is suitable. Nearly all battery operated
digital multimeters that have a 20 V AC range
are suitable. (See Fig. A)
To Exposed Metal
Parts on Set
0.15 µ F
1.5 k Z
Earth Ground
Fig A. Using an AC voltmeter to check AC leakage.
AC
voltmeter
(5.25V)