Cisco Catalyst 5500 Manuel - Sayfa 16
Ağ Donanımı Cisco Catalyst 5500 için çevrimiçi göz atın veya pdf Manuel indirin. Cisco Catalyst 5500 19 sayfaları. Multiswitch router
Replacing Hardware Components
The fan assembly is designed to be removed and replaced while the system is operating without
Note
presenting an electrical hazard or damage to the system.
Locate the fan assembly to the left of the card cage (see
Step 1
Loosen the two captive installation screws by turning them counterclockwise.
Step 2
Grasp the fan assembly with both hands and pull it outward, joggling it if necessary to unseat it from the
Step 3
backplane. Pull it clear of the chassis and place it in a safe location.
Installing the Fan Assembly
Perform the following steps to install the new fan assembly:
Hold the fan assembly with the fans facing to the right.
Step 1
Place the fan assembly into the front chassis cavity so that it rests on the chassis, and then lift the fan
Step 2
assembly up slightly, aligning the top and bottom guides.
Push the fan assembly into the chassis until the captive installation screws meet the chassis.
Step 3
Tighten the captive installation screws by turning them clockwise.
Step 4
Figure 7-13 Cisco Catalyst 5500 Chassis Fan Assembly
Cisco MGC Software Release 7 Operations, Maintenance, and Troubleshooting Guide
7-16
SUPERVISOR ENGINE
SUPERVISOR ENGINE
Chapter 7
Maintaining the Cisco Catalyst 5500 Multiswitch Router
Figure
7-13).
OL-0542-06