ACU-RITE SENC 150 Kurulum Kılavuzu - Sayfa 4
Medya Dönüştürücü ACU-RITE SENC 150 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. ACU-RITE SENC 150 6 sayfaları. Chevalier fsg-2a 1224 surface grinder cross feed “x” axis
Ayrıca ACU-RITE SENC 150 için: Kurulum Kılavuzu (8 sayfalar), Referans Kılavuzu (20 sayfalar), Kurulum Kılavuzu (4 sayfalar), Talimatlar Kılavuzu (12 sayfalar)
SENC 150
Cross Feed Installation ...
* Supplied with encoder hardware
1/4" Flat washer
.09" thk. (2)
* 1/4-20 x 1" BHCS (2)
ENC 150 Encoder
Mounting Information...
These instructions are for mounting the 13" encoder to
the Series 1 knee mill. Bridgeport machines have the
encoder mounting holes provided since 1985. These
instructions assume these holes are present.
Before proceeding:
Please read the Procedure completely.
Mount X axis prior to installing the cross feed.
Clean the mounting surfaces.
Save the alignment brackets with the Encoder
Reference Manual after installation is completed.
First Steps ...
Machine
Move the table to its center of travel.
Mark the axis so that it can be re-centered easily.
Move the saddle completely forward on the knee.
P.N. 385072-214 Ed C 11/05
Spacer (2)
Spar
* 8-32 x 3/4" SHCS (2)
Low head screw
Installation Manual 385072-41
Encoder Installation Manual for: Bridgeport
Cross Feed Y Axis - Right hand side
Reading head mtg.
brkt.
Encoder
Unpack encoder in a safe, convenient location.
Do not remove the reading head alignment
brackets until instructed.
Center reading head ...
Alignment bracket (2)
•
Slide the reading head and brackets along the scale
case until the center marks on the scale case and
reading head are aligned.
1
Series I - Vertical Knee Mill
* M6 flat washer (2)
.017" thick
1/4-20 x 1-1/4" BHCS (2)
Align
center
marks
Acu-Rite Companies Inc.