Cisco WS-C6509 Yükseltme Kılavuzu - Sayfa 9
Ağ Donanımı Cisco WS-C6509 için çevrimiçi göz atın veya pdf Yükseltme Kılavuzu indirin. Cisco WS-C6509 24 sayfaları. Catalyst 6500 series
Ayrıca Cisco WS-C6509 için: Kullanıcı Kılavuzu (28 sayfalar), Veri Sayfası (30 sayfalar)
Installing the High Speed Fan Tray
To install the high speed fan tray (WS-C6509-NEB-FAN2), follow these steps:
Hold the fan tray with the fans facing down and the FAN FAIL LED on the right. (See
Step 1
Figure 4
Captive installation
Place the fan tray into the front chassis cavity so that it rests on the chassis, and then lift the fan tray up
Step 2
slightly, aligning the top and bottom chassis guides.
Push the fan tray into the chassis until the power connector seats in the backplane and the captive
Step 3
installation screws make contact with the chassis.
Use a flat-blade or number 2 Phillips-head screwdriver to tighten the captive installation screws.
Step 4
Proceed to the
Step 5
78-16162-02
Installing the High Speed Fan Tray
48V INPUT 1
HIGH SPEE D FAN
INPOUT POWER
GOOD
RTN -48VDC GND
WS-C6 500-NE B-FAN2
screw
o
"Replacing the Power Supply" section on page 10
Captive installation
screw
48V INPUT 2
FAN FAIL
INPOUT POWER
GOOD
RTN -48VDC GND
o
INPUT
FAN
OUTPUT
OK
OK
FAIL
INPUT
FAN
OUTPUT
OK
OK
FAIL
Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note
Replacing the Fan Tray
Figure
to replace the power supply.
4.)
9