Cisco UCS B200 M3 Kurulum ve Servis Notu - Sayfa 23

Sunucu Cisco UCS B200 M3 için çevrimiçi göz atın veya pdf Kurulum ve Servis Notu indirin. Cisco UCS B200 M3 37 sayfaları. Blade server
Ayrıca Cisco UCS B200 M3 için: Kurulum Kılavuzu (34 sayfalar), Kurulum ve Servis Notu (36 sayfalar), Manuel (8 sayfalar), Yükseltme Kılavuzu (21 sayfalar), Kurulum ve Servis Notu (28 sayfalar)

Cisco UCS B200 M3 Kurulum ve Servis Notu
Step 6
Close the socket latch. See callout 1 in the following figure.
Step 7
Secure the first hook, which has the following icon:
Step 8
Secure the second hook, which has the following icon:
Figure 16: Replacing the Heat Sink (B200 M3 Shown)
Step 9
Using the syringe of thermal grease provided with replacement CPUs and servers (UCS-CPU-GREASE=), add 2 cubic
centimeters of thermal grease to the top of the CPU where it will contact the heat sink. Use the pattern shown. This should
require half the contents of the syringe.
The thermal grease has very specific thermal properties, and thermal grease from other sources should not be
Caution
substituted. Using other thermal grease may lead to damage.
Note
CPU spares come with two syringes of thermal grease; one with a blue cap and one with a red cap. The syringe
with the blue cap is UCS-CPU-GREASE=, which is used with this server
See callout 2 in the following figure.
See callout 3 in the following figure.
23