Cisco VG400 series Donanım Kurulum Kılavuzu - Sayfa 26

Ağ Geçidi Cisco VG400 series için çevrimiçi göz atın veya pdf Donanım Kurulum Kılavuzu indirin. Cisco VG400 series 40 sayfaları. Voice gateway
Ayrıca Cisco VG400 series için: Yazılım Yapılandırma Kılavuzu (22 sayfalar), Yükleme (13 sayfalar)

Cisco VG400 series Donanım Kurulum Kılavuzu
Chassis Grounding
After you install the voice gateway, you must connect the chassis to a reliable earth ground. For the chassis
ground connection procedures, see the Chassis Grounding section.
Chassis Grounding
Warning
To reduce the risk of electric shock, the chassis of this equipment needs to be connected to permanent earth
ground during normal use. Statement 445
Use a size 14 AWG (2 mm2) or larger copper wire and an appropriate user-supplied ring terminal with an
inner diameter of 1/4 in. (5–7 mm).
To install the ground connection for your router, perform the following steps:
SUMMARY STEPS
1. Strip one end of the ground wire to the length required for the ring terminal.
2. Crimp the ground wire to the ring terminal, using a crimp tool of the appropriate size.
3. Attach the ground lug or ring terminal to the chassis as shown in the following image. Use one of the
screws provided. Tighten the screws to a torque of 8 to 10 in-lb (0.9 to 1.1 N-m).
4. Connect the other end of the ground wire to a known reliable earth ground point at your site.
DETAILED STEPS
Step 1
Strip one end of the ground wire to the length required for the ring terminal.
Step 2
Crimp the ground wire to the ring terminal, using a crimp tool of the appropriate size.
Step 3
Attach the ground lug or ring terminal to the chassis as shown in the following image. Use one of the screws provided.
Tighten the screws to a torque of 8 to 10 in-lb (0.9 to 1.1 N-m).
Cisco VG400 Voice Gateway Hardware Installation Guide
24
Installing the Cisco VG400 Voice Gateway