Toshiba TLP510E Servis Kılavuzu - Sayfa 4

Projektör Toshiba TLP510E için çevrimiçi göz atın veya pdf Servis Kılavuzu indirin. Toshiba TLP510E 33 sayfaları. 3lcd data projector
Ayrıca Toshiba TLP510E için: Teknik Eğitim Kılavuzu (47 sayfalar)

Electronic parts are susceptible to static electricity and may easily damaged, so do not forget to take a proper
grounding treatment as required.
Many screws are used inside the unit. To prevent missing, dropping, etc. of the screws, always use a magnetized
screwdriver in servicing. Several kinds of screws are used and some of them need special cautions. That is, take care
of the tapping screws securing molded parts and fine pitch screws used to secure metal parts. If they are used
improperly, the screw holes will be easily damaged and the parts can not be fixed.

3. DISASSEMBLING

3-1. Main Unit (1)

3-1-1. Document Camera (TLP511U/E)
1. Remove 4 screws (1) and remove document camera
rear plate.
2. Disconnect 1 connector (2) connected to the document
camera.
3. Remove 5 screws (3) and remove the document
camera.
Document camera
Connector (2)
Fig. 3-1-1
CAUTIONS BEFORE STARTING SERVICING
Screws (3)
Document camera
rear plate
Screws (1)
3-1-2. Top Cover and Speaker
1. Remove document camera. (TLP511U/E: Refer to Fig.
3-1-1.)
2. Remove top tag and remove 1 screw (1).
3. Remove 6 screws (2) and lift up top cover while
pressing section A of the top cover.
4. Remove speaker connector (3) and remove top cover.
5. Remove 2 screws (4) securing speaker holder, and
remove speaker from speaker holder.
Screws (2)
Top cover
Section A
1-2
Top tag
Screw (1)
Screws (2)
Speaker
Screws (4)
Speaker
connector (3)
Fig. 3-1-2
Screws (2)
Speaker
holder