aerauliqa QR590E Kurulum Kılavuzu - Sayfa 5

Isıtma Sistemi aerauliqa QR590E için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. aerauliqa QR590E 20 sayfaları. Energy recovery ventilation unit with enthalpic heat exchanger

aerauliqa QR590E Kurulum Kılavuzu

5.3 Installation

The unit must be installed in the following position.
Fig. 5.a.b
Fig. 5.c
Ø 150-160
Ø 150-160
Fig. 5.d
5.a Prepare the surface where the unit is to be mounted. Make sure that the surface is flat, leveled and that it supports the weight
of the unit. Perform the installation in accordance with local rules and regulations.
5.b Use the wall fixing bracket as template to indicate where to drill the holes in the wall: make sure it is at spirit level. Use
appropriate screws and wall plugs (not supplied) to fix the wall fixing bracket.
5.c Hook the unit at its bracket and fix it by means of the safety screw.
5.d Connect the unit to the duct system. Make sure that all necessary accessories are used to create a functional ventilation
solution.
5.e Connect the unit electrically according to point 5.4. Check that it starts up correctly.
Spirit level
Livella a bolla d'aria
Fig. 5.e
5