Blackberry ITC100-2 Kurulum Kılavuzu - Sayfa 15

Radar Blackberry ITC100-2 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Blackberry ITC100-2 28 sayfaları. Dry van, insulated trailers roll-up doors
Ayrıca Blackberry ITC100-2 için: Kurulum Kılavuzu (33 sayfalar), Kurulum Kılavuzu (26 sayfalar), Kurulum Kılavuzu (32 sayfalar), Kurulum Kılavuzu (33 sayfalar), Kurulum Kılavuzu (35 sayfalar), Kurulum Kılavuzu (28 sayfalar), Kurulum Kılavuzu (34 sayfalar), Kurulum Kılavuzu (35 sayfalar), Kurulum Kılavuzu (30 sayfalar), Kurulum Kılavuzu (35 sayfalar), Kullanım Kılavuzu (33 sayfalar), Kurulum Kılavuzu (32 sayfalar), Kurulum Kılavuzu (26 sayfalar), Kurulum Kılavuzu (25 sayfalar), Kullanım Kılavuzu (35 sayfalar)

Blackberry ITC100-2 Kurulum Kılavuzu
BLACKBERRY RADAR H2 ITC100-1, ITC100-2, ITF100-1 INSTALLATION GUIDE

3.4.3 Flatbed/heavy equipment installation procedure

If you are using BlackBerry Radar H2 to track an asset without doors, or do not wish to
monitor door open/close events for your asset, you may mount the module on any flat,
vertical or horizontal surface that offers enough mounting area for the module. When
selecting a mounting location, carefully consider how the asset will be used in its normal,
day-to-day operation.
Do not place the assembly in a location where it is susceptible to damage from:
Normal usage activities, such as loading or unloading cargo.
Moving parts of the asset.
Road debris.
When mounting under a vehicle or piece of equipment, you must exercise a high degree
of caution to avoid serious damage to yourself or your equipment:
Do not install near exhaust sources, ignition sources, or fuel tanks.
Be careful when installing near pneumatic, hydraulic, and electrical lines to
prevent damage to these components during the installation process.
Before drilling into the frame, consult the user manual for your equipment to
ensure you're familiar with the manufacturer's guidelines for drilling holes into
the frame.
FLATBED AND HEAVY EQUIPMENT
15