Blackberry RADAR-M ITA100-1 Kurulum Kılavuzu - Sayfa 19

Radar Blackberry RADAR-M ITA100-1 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Blackberry RADAR-M ITA100-1 39 sayfaları. Container, dry van, insulated trailers barn doors
Ayrıca Blackberry RADAR-M ITA100-1 için: Kurulum Kılavuzu (27 sayfalar), Kurulum Kılavuzu (36 sayfalar)

Blackberry RADAR-M ITA100-1 Kurulum Kılavuzu
BLACKBERRY RADAR ITA100-1 CHASSIS BRACKET INSTALLATION GUIDE 19
11. After completing the cable connection, the LED will blink for approximately ten
seconds. This blinking LED indicates the device is powered on. Please note: it can
take 20-30 seconds after the cables are connected for the LED to start blinking.
NOTE: For installations using the chassis bracket, you may leave the lens overlay in
place to protect the lens, as the sensors for load detection (located under the overlay)
will not be used in these installations.
12. Stow the cable connectors in the cable connector recess. Secure any excess cable in
the cable retaining features.
Cable Retaining Features (6)
Tip: When placing the cable connectors inside the cable connector recess, take care
to avoid crossing the cable over itself. Doing so can make it more difficult to secure
the cable and attach the lid.
Blinking LED
Connector Recess
Incorrect Installation—Crossed Cable