Aleko SHEM8BLK Kurulum ve Kullanım Kılavuzu - Sayfa 12
Sıhhi Tesisat Ürünleri Aleko SHEM8BLK için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Kılavuzu indirin. Aleko SHEM8BLK 20 sayfaları. Outdoor sauna
10
Step 12: Install Remaining Right Side Wall Staves
Attach the remaining right-side wall staves (54-62) and
secure to the front and back wall panels with screws.
Step 13: Install Left Side Glass Panel
Attach the left-side glass panel. At this point, someone
should hold the back wall panel until Step 13 to prevent it
from falling.
Step 14: Install Roof Panel
Attach the remaining left-side wall staves (93-101) and
secure to the roof and back wall panels with screws.