Alemite 7341 Servis Kılavuzu - Sayfa 10

Kablolar ve konektörler Alemite 7341 için çevrimiçi göz atın veya pdf Servis Kılavuzu indirin. Alemite 7341 12 sayfaları. High-capacity
Ayrıca Alemite 7341 için: Servis Kılavuzu (16 sayfalar)

Alemite 7341 Servis Kılavuzu
SER 7340
Accessories Attachment and Pressurization
11. Install the control valve onto the delivery hose.
12. Pressurize the system.
• Check for leaks.
13. Install and secure the hose stop to the delivery hose at the
desired position.
14. Make sure the reel is latched then:
• instruct the assistant to let go of the Sheave Assembly
• carefully remove the clamp from the Sheave Assembly
15. Pull the delivery hose to disengage the Ratchet.
16. Allow the delivery hose to slowly retract onto the Sheave
Assembly.
Checking Spring Tension
17. Check to ensure the tension on the power spring is sufficient
to properly hold the hose stop against the hose guide.
Figure 5 Clamp Attached to Sheave Assembly
Revision (2-03)
or
Should the power spring tension require
adjustment:
Adjusting Spring Tension
Do not overwind the power spring. Too much
tension reduces the life of the spring.
When the hose is fully extended from the
reel, the power spring should be a minimum
of 1/2 turn from a fully wound condition.
18. Release all pressure within the system.
Disconnect the air supply line to the
pump's motor.
Into an appropriate container, operate the
c o n t r o l v a l v e t o d i s c h a r g e r e m a i n i n g
pressure within the system.
19. Remove the control valve and the hose stop
from the delivery hose.
20. Pull the free end of the delivery hose through
the guide.
21. Rotate the Sheave Assembly in the required
direction.
22. Install the control valve and the hose stop.
23. Pressurize the system.
24. Check to ensure the tension on the power spring
is sufficient to properly hold the hose stop
against the hose guide.
25. Repeat steps 18 - 24 until the proper tension is
achieved.
10
High-Capacity Reel
CAUTION
WARNING
Alemite Corporation