Acorn OMEGA Kurulum, Çalıştırma ve Bakım Talimatları - Sayfa 4
Kontrol Ünitesi Acorn OMEGA için çevrimiçi göz atın veya pdf Kurulum, Çalıştırma ve Bakım Talimatları indirin. Acorn OMEGA 6 sayfaları. Thermostatic mixing valve
INSTALLATION: ST7017-CU & -CPVC
1. Locate mixing valve 1 in a suitable place
accessible for servicing and adjusting. Valve
should be as close as possible to point of use.
2. Thoroughly flush supplies.
3. Slide Brass Nut 2, onto supply and outlet
Tubing.
4. Insert Tubing Adapter 3 onto the end of the
Tubing 4,
a. For -CU sweat Adapter 3 to Tube
b. For -CPVC Glue Adapter 3 to end of tubing
using appropriate PVC Pipe Cement.
5. Insert Gasket 5 between Valve body 1 and
Adapter 3 then tighten Hex Nut 2.
6. Slowly turn on supplies, check for leaks and
tighten Hex Nut 2 if needed.
7
Detail - A
Acorn Controls
Division of Acorn Engineering Company
Manual #7802-127-001
1
6
®
ST7017 Installation & Operation Manual
TEMPERATURE ADJUSTMENT:
1. Using 5/8" 6 Wrench loosen Locknut 7.
Detail A
2. Turn on fixture so temperature can stabilize.
3. Using an 1/8" Allen Wrench 8, turn adjustment
stem 9 counter-clockwise for hotter or
clockwise for colder outlet temperature.
Detail B
4. Tighten locknut 7 to prevent any unauthorized
or accidental temperature adjustment.
5. Turn on fixture(s) and re-check temperature.
3
5
9
, A member of Morris Group International
2
4
Detail - B
™
Page 4 of 6
Date: 07/20/2020
8