Lenovo 7D27 Manuel - Sayfa 3

Sunucu Lenovo 7D27 için çevrimiçi göz atın veya pdf Manuel indirin. Lenovo 7D27 8 sayfaları. Toolless friction rail v2
Ayrıca Lenovo 7D27 için: Manuel (12 sayfalar)

Lenovo 7D27 Manuel
The rail package contains the following items:
1
Document
2
Left rail
3
Right rail
4
Two M6 screws
Note: When install the outer rail to the vertical rack, use left rail as top rail, and right rail as bottom rail.
Horizontal and vertical rack
In Horizontal rack, servers are installed and placed horizontally. In vertical rack, servers are installed and
placed vertically. See the illustration below.
1
Horizontal rack
2
Vertical rack
3 3