Armstrong 320 Kurulum ve Bakım Kılavuzu - Sayfa 11
Kontrol Ünitesi Armstrong 320 için çevrimiçi göz atın veya pdf Kurulum ve Bakım Kılavuzu indirin. Armstrong 320 20 sayfaları. Water temperature controls groups of fixtures - thermostatic
Ayrıca Armstrong 320 için: Kurulum ve Bakım Kılavuzu (20 sayfalar)
Step 5
Model 320 must be installed in a standard HOT-LEFT/COLD-RIGHT inlet supply configuration.
There are red (hot) and blue (cold) markings on each valve.
The inlet supplies must always match the corresponding inlet ports on the valve.
Step 6
a. Fully tighten all of the pipes using an adjustable spanner.
Caution! Use a soft cloth to cover the plating from
damage while tigtening with spanner.
Step 7
a. Turn on the water supply and ensure that there are
no leaks.
11