Armstrong GP-2000R Kurulum, Çalıştırma ve Bakım Talimatları - Sayfa 5

Kontrolör Armstrong GP-2000R için çevrimiçi göz atın veya pdf Kurulum, Çalıştırma ve Bakım Talimatları indirin. Armstrong GP-2000R 6 sayfaları. Back pressure regulator

1. All 2000 series valves with remote mount pilots
have the following similar parts: 1/4" long nipple (4),
1/4" x 1/4" short nipple (6), fitting B (13), and union
set (5). Use thread tape on the threads of
both nipples.
2. Remove the 1/4" plug on the inlet side of the main
valve (1) with an allen wrench.
3. Thread the 1/4" long nipple (4) into the main valve (1) in
place of the 1/4" plug.
4. Thread one-half of the union set (5) onto the long
nipple (4). Thread the other half onto the short nipple.
GP-2000R Remote Mount
Figure 4-1
1
10
9
13
7
10
Tubing Assembly Instructions
2
6
14
5
15
4
8
12
6. Thread the short nipple (6) into the pilot (2). The short
nipple (6) will thread into the bottom cap of the pres-
sure pilot (2) remote mount.
7. Place fitting "A" (14) into the pilot and thread into
place. Note: This fitting is full port with no restriction
fitting (14). Use Teflon
8. Once the union set (5) has been tightened it should be
facing the main valve (1). See remote mount drawing.
9. Connect the "S" shaped D-tube (9) to the outlet of the
pressure pilot at fitting "A" (14) and to the top of the
tee (12) and tighten. Note: Make sure the downstream
sensing port (15) on the pilot faces upstream.
Part Listing
1.
Main Valve Body
2.
Back Pressure Pilot
3.
Temperature Pilot (not shown)
4.
1/4" Long Nipple
5.
Union Set
6.
1/4" x 1/4" Short Nipple
7.
B-Tube
8.
C-Tube
9.
D-Tube
10.
Elbow
11.
Capillary (Not Shown)
12.
Tee
13.
Fitting B
14.
Fitting A
15.
Upstream Sensing Port
5
®
tape on valve fittings.