Armstrong 21-AR Hızlı Başlangıç Kılavuzu - Sayfa 4
Fan Armstrong 21-AR için çevrimiçi göz atın veya pdf Hızlı Başlangıç Kılavuzu indirin. Armstrong 21-AR 4 sayfaları. Fixed pivot air/gas vents
Ayrıca Armstrong 21-AR için: Talimatlar (4 sayfalar)
MAINTENANCE
For troubleshooting, testing methods, frequency of maintenance and detailed spare parts list, see Armstrong
literature or consult your local Representative.
EQUIPMENT UNDER PRESSURE
OPERATING TEMPERATURE > 90°C
MAKE SURE VENT IS COLD BEFORE HANDLING
I. Internals Maintenance:
-
Remove the complete vent from the line;
-
Unscrew bolts (9) and nuts (8) and remove the cap (1) with the operating mechanism fixed
on it;
-
Unscrew the seat (3) and replace the complete Mechanism Less Float (3, 4, 5);
-
Screw back the seat (3) and make sure that the lever (5) is aligned in the axis of the cap (1).
A clearance of 0,1 mm should be left in order to allow the lever (5) to move horizontally.
-
Replace the float (6) if necessary;
-
Replace gasket (7);
-
Put the cap (1) back on the body (2) and screw bolts (9) and nuts (8).
Armstrong International, S.A., Parc Industriel des Hauts-Sarts, 4040 Herstal – Belgium Ph: +32.4.240.90.90 Fax: +32.4.248.13.61
IOM-1073-A
05/02
www.armstrong.be
Printed in Belgium