Acorn Safety S0420 Kurulum, Çalıştırma ve Bakım Talimatları - Sayfa 2

Yıkayıcı Acorn Safety S0420 için çevrimiçi göz atın veya pdf Kurulum, Çalıştırma ve Bakım Talimatları indirin. Acorn Safety S0420 5 sayfaları. Eyewash / facewash

Installation & Operation Manual

BEFORE INSTALLATION

1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation. See page 4.
3. Thoroughly rinse unit inside and outside with HOT soapy water (use mild soap & potable water). Ensure that no foreign
matter or particles are left inside unit especially in the sprayhead ports. Inspect for leaks.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is provided for
documentation purposes.
5. All employees at risk of eye contamination should be informed and trained in the use of this and any other safety equipment.
ROUGH-IN
3
35
"
8
GENERAL NOTES:
1. ALL DIMENSIONS ARE IN INCHES
*2. DIMENSIONS SHOWN ARE FOR NORMAL ADULT HEIGHT. ANSI Z358. 1 REQUIRE NOZZLES TO BE
BETWEEN 33" AND 45" ABOVE THE FLOOR.
Acorn Safety
a division of Acorn Engineering
Manual #7109-100-001
1"
3
* 35
"
8
REF
1
1
"
4
OD
TAILPIECE
3
5
"
8
SUPPLY
FLOOR LINE
3
4XØ
" MTG HOLES
8
FLOOR LINE
MOUNTING DETAIL
*42"
3
*40
"
8
* 36"
5
* 31
"
8
Company
Page 2 of 5
FINISHED
WALL
1
" NPT
2
SUPPLY
5
5
"
8
5
8
"
8
Revised: 07/23/13