Cub Cadet 190 Operatör El Kitabı - Sayfa 6
Çim Biçme Makinesi Aksesuarları Cub Cadet 190 için çevrimiçi göz atın veya pdf Operatör El Kitabı indirin. Cub Cadet 190 12 sayfaları. Grass collection system
2
Assembly
And
Operation
NOTE:
An extra set of
carriage bolt and lock
nut have been supplied
in your accessory kit.
You may replace the
old hardware for the
chute stop bracket with
these new ones, or
save for later use.
NOTE:
This chute stop
bracket may stay
on the unit even when
the bagger is not
being used.
Attaching Chute Stop Bracket
• Remove the carriage bolt and lock nut holding the
chute stop to the deck. See Inset A of Fig. 2-8. Save
the hardware.
• Replace with new chute stop bracket, from the bag-
ger kit, at the same position on the deck. See Inset
B of Fig. 2-8. Secure with the hardware removed
earlier.
NOTE: An extra set of carriage bolt and lock nut have
been supplied in your accessory kit. You may replace
the old hardware for the chute stop bracket with these
new ones, or save for later use.
NOTE: This chute stop bracket may stay on the unit
even when the bagger is not being used.
Attaching Discharge Chute
• Raise the deck to its highest position.
• Raise the chute deflector (A in Fig. 2-9) on the deck
and hold it while you position the discharge chute
over the chute opening.
• Insert the hinge pin of the discharge chute into the
tube on the chute stop bracket. See B in Fig. 2-9.
• Rotate the chute around the deck so that its front
edge fits snugly into the deck opening. Lower the
chute deflector slowly(C in Fig. 2-9).
• Attach the longer of the three retainer straps on the
discharge chute to the retainer clip on the deck.
Refer to Fig. 2-10.
A
Figure 2-8
A
Hinge Pin
Figure 2-9
Attach long
strap here
Figure 2-10
B
C
B
Discharge Chute