DISCOVER LYNK II Kullanıcı Kılavuzu - Sayfa 16
Ağ Geçidi DISCOVER LYNK II için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. DISCOVER LYNK II 18 sayfaları. Sma sunny island
Figure 7. Sunny Island Remote Control - Init System
3. When replacing batteries in an existing system with Discover Lithium batteries,
turn clockwise the button on the Sunny Remote Control and select 'New Battery.'
Press the button to confirm your selection of 'New Battery.'
When commissioning a 'New System,' wait until prompted to enter battery
parameters.
Set the following parameters for Discover Lithium batteries:
• Battery Type: LiIon_Ext-BMS
• Nominal capacity of the battery: Installed number of batteries x their nominal
capacity in Ah
4. Confirm the settings to complete the process.
• Nominal voltage for the battery is automatically set to 48 V.
• Only mandatory values for the basic operation of the Sunny Island system are
available for set up in the QCG.
7.3 Setting Up Sunny Island 4.4M, 6.0H, and 8.0H from the Integrated Web
Interface
Geared to readers familiar with SMA Sunny Island -12 generation or later
operations, the following instructions are for a system with a single Sunny Island
in an off-grid application. Refer to the Sunny Island Manual to install a system with
multiple Sunny Island inverters.
Follow the commissioning instructions in the Sunny Island 4.4M / 6.0H / 8.0H
Operating Manual, which use a web-based interface.
1. After installing the batteries described in the Discover Lithium battery manual,
establish a direct connection (WLAN or Ethernet) to Sunny Island and log into
the user interface as an installer.
2. When replacing batteries in an existing system with Discover Lithium batteries,
go to the Battery Configuration tab.
When commissioning a system for the first time, the installation assistant guides
you through the process.
Boot
xx. xx. xxxx
NOTE
16
xxx. xx
<Init System>
xx:xx:xx