Aerial AD 790 Kullanım Kılavuzu - Sayfa 5

Nem Alıcı Aerial AD 790 için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. Aerial AD 790 15 sayfaları.

Aerial AD 790 Kullanım Kılavuzu

4.Installation and transport

The AD 7.. is planned for the mobile effort. During the setting up and transportation
of the dehumidifier, the following items are to be considered:
Ø That dehumidifier must be installed so that the air can circulate without
obstruction through him. The air filter and also the outlet grille of the front wall
must not be covered. The open space before the outlet grille and the air filter
must at least conduct 1 meter.
Ø Before every local alternation of the device, switch off the device at the on/off-
switch, pull the power plug from the socket and empty the water tank!
Ø The air dryer must be moved only using the provided wheels and handhold!
Ø The air dryer must be installed on a plane base only, as otherwise it must be
secured against rolling off!
Ø That dehumidifier can be transported upright or laid flat! The upright
transportation is to be preferred if possible.
Ø The appliance must be used exclusively for air drying.
ATTENTION:
Do never pull or move the device at the power cable

5.Operation

5.1 electrical connection

Before connecting the air dryer, the following items must be checked:
Ø Does the mains voltage coincide with the voltage of the appliance?
Ø Adequate fusing of socket and supply system?
Ø Has the required residual-current-operated circuitbreaker (r.c.c.b) been installed
in case of swimming baths?
Ø If a cable drum is used: has it been unwound completely?
Ø Is the appliance connector suitable for the building socket?
Ø Is the socket provided with a earth connection?
ATTENTION:
Before putting the air dryer into operation, the technical data of the appliance
should be compared to the conditions prevailing in the room of installation!
Page 5 of 15