Aerial AERCUBE VP3 Series Kullanım Kılavuzu - Sayfa 9
Nem Alıcı Aerial AERCUBE VP3 Series için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. Aerial AERCUBE VP3 Series 20 sayfaları. Soundbox

4
Transport and installation
Transport
1.
Remove the packaging material completely and dispose of according to the
local regulations.
2.
Check the delivery for completeness.
3.
Use the lateral handles or the handle in the middle of the cover to transport
the sound box to the place of installation.
Scope of delivery
Soundbox VP2 / VP 3
◼
One instruction manual
◼
Operating conditions
The soundbox VP2 / VP3 is intended for use in screed and insulation layer drying and
hollow space drying. It works without problems in the temperature range from 0 °C to
+35 °C. In case of floor installation it must be ensured that sensitive floors are protected
against the thermal load from the device.
Fig. 2: Fixing points for belt system
TRANSPORT AND INSTALLATION
Installation
The devices can be stacked, and are
provided with fixing points for a belt
system on the right and left.
Page 7 of 18