Aerial MURA PSGC Kullanıcı El Kitabı - Sayfa 4
Koruma Cihazı Aerial MURA PSGC için çevrimiçi göz atın veya pdf Kullanıcı El Kitabı indirin. Aerial MURA PSGC 20 sayfaları. Release kit
Preflight Inspection
2
.
It is the responsibility of the air crewman to inspect the entire release system before
flight operations. Perform a preflight inspection prior to each flight and at intervals not
to exceed 30 days. If damage is found during an inspection, the vest must be grounded
until repaired.
2.1. Inspect the outside of the release system for:
• Cuts, tears, and abrasion damage
• Functionality of the release
• Contamination damage
2.2. Ensure that the handle is attached and secure
2.3. Ensure the MURA performs properly using the thumb release.
2.4. Ensure that the MURA is secured to the vest.
3. Functional/Annual Check
This recommended functional check should be performed on the MURA periodically:
3.1. Remove the release handle from the pocket and pull the cable to actuate the quick
release. Ensure the force required to actuate the quick release is below 5 lbs.
3.2. Check the quick release assembly for cracks and gouges in the metal. Replace the
MURA if cracks or gouges are found. Scratches and chips in the paint are acceptable.
3.3. Inspect the fabric and webbing on the MURA for cuts or significant fraying, espe-
cially in areas around other metal components. Ensure stitching is intact and not frayed.
Replace the MURA if damage is found.
Note: Stitches will often have loose threads at the start or termination of the stitch pat-
tern, also known as the back stitches. If part of the thread on the back stitch has come
loose, this is not cause for rejection. Trim any loose back stitch threads to keep the
stitch from unraveling.
Aerial Machine and Tool Corp.
MURA Release Kit - User's Manual
Page 4