CAME F1100 Kurulum Kılavuzu - Sayfa 12

Kapı açma sistemi CAME F1100 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. CAME F1100 15 sayfaları. External automation system with articulated arms for hinged gates
Ayrıca CAME F1100 için: Standart Kurulum (16 sayfalar), Manaul (16 sayfalar), Standart Kurulum (12 sayfalar)

CAME F1100 Kurulum Kılavuzu
Periodic maintenance log for end-user (every 6 moths)
Date
7.3 Extra-ordinary maintenance
The following table serves to note down any extraordinary maintenance, repairs or improvements performed by specialised firms.
N.B.: Any extraordinary maintenance must be performed by specialised technicians.
Extra-ordinary maintenance log
Installer's stamp
Job performed _______________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
Installer's stamp
Job performed _______________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
Installer's stamp
Job performed _______________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
Notes
Operator name
Date of job
Technician's signature
Requester's signature
Operator name
Date of job
Technician's signature
Requester's signature
Operator name
Date of job
Technician's signature
Requester's signature
Signature