Cameron TBV 2100 Series Kullanım ve Bakım Kılavuzu - Sayfa 3
Kontrol Ünitesi Cameron TBV 2100 Series için çevrimiçi göz atın veya pdf Kullanım ve Bakım Kılavuzu indirin. Cameron TBV 2100 Series 5 sayfaları. Cryogenic three piece ball valve
6. After installation, cycle valve several times to assure smooth operation.
OPERATION
1. A quarter turn of the handle clockwise closes the valve and a quarter turn counterclockwise
opens the valve. Visual indication of the ball position is determined by the handle or stem
position: when the handle, or the stem flats, inline with the piping the valve is open; across the
line, the valve is closed.
2. Cryogenic ball valves perform best with the ball either fully open or fully closed. Consult the
factory regarding characteristics of the media or pressure drop for applications other than fully
open or closed.
3. Any media that might solidify, crystallize or polymerize should not be allowed to stand in the
ball valve cavities. In the event that this should happen, DO NOT force the valve in either
direction; disassemble and clean before resuming service.
4. Break-away torque (i.e., force which must be exerted to start moving the valve ball) will vary
depending on the media, pressure and length of time between cycles, as well as valve seat and
packing materials. Consult the factory for specific values.
MAINTENANCE
A repair kit containing the appropriate number of components is available for rebuilding each size
and configuration of valve. Be sure to specify the complete valve model number, and the TBV Inc.
sales order number that is stamped on the valve body, when ordering. Additional components, such
as balls, stems, etc. are also available for repair purposes. Refer to illustration for part
identification.
AT ALL STAGES OF THE FOLLOWING DIS-ASSEMBLY AND RE-ASSEMBLY
PROCEDURES, CARE MUST BE TAKEN TO AVOID DAMAGE TO ALL SEALING
SURFACES.
1. Before removing valve from line, make absolutely certain that line pressure is shut down, and
that the line is vented, to remove all pressure from the valve. Operate the valve to assure that
there is no pressure or media trapped within the valve body cavity. Flush the line as
appropriate to remove harmful chemicals that may be present.
2. Remove the valve from the line. Be certain to fully decontaminate the valve, if it has been used
in services that have any degree of toxicity. Wear protective gloves and clothing as appropriate
to avoid contact with potentially harmful chemicals.
3. Before removing valve from line rotate ball into the open position.
4. Remove four body bolts and disassemble from line making sure to allow sufficient pipe end
clearance for center section removal.
5. Remove body seals from end plates.
2 1/2"
45-50 foot-pounds
Page 3 of 5
OM-TBV-2100 Rev.05 – 05/07