esera automation 11211 Kullanıcı Kılavuzu - Sayfa 6
Kontrol Ünitesi esera automation 11211 için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. esera automation 11211 7 sayfaları. 1-wire dual s0 counter module
16
Storage of counter values / Delete counter values
The counter reading of the Dual S0 counter module is stored permanently, even without power supply.
The counter reading can be set to 0 by pressing the reset button for approx. 3 seconds. In order to avoid an
accidental reset of the counter reading, the reset button is recessed on the top of the module. To operate the reset
button, you need a pointed object, such as a match or toothpick.
17
Operating conditions
The module may only be operated at the specified voltages and ambient conditions. The device can be operated
in any position. The device is intended for use in dry and dust-free rooms.
If condensation is formed, allow at least 2 hours for the unit to acclimatize.
The modules may only be put into operation under the supervision of a qualified electrician. Do not operate the
module in an environment in which flammable gases, vapors or dust are present or could be present.
18
Assembly
The installation site must be protected from moisture. The device may only be used in dry indoor areas. The device
is intended for installation inside a control cabinet as a stationary device.
19
Disposal instructions
Do not dispose of the device in domestic waste! Electronic devices are to be disposed of according to
the Directive on waste electrical and electronic equipment (WEEE) on local authorities and
collection points for waste electronic equipment!
20
Safety Instructions
When using products that come into contact with electrical voltage, the valid VDE regulations must be
observed, especially VDE 0100, VDE 0550/0551, VDE 0700, VDE 0711 and VDE 0860
All final or wiring work must be carried out with the power turned off.
Before opening the device, always unplug or make sure that the unit is disconnected from the
mains.
Components, modules or devices may only be put into service if they are mounted in a contact
proof housing. During installation they must not have power applied.
Tools may only be used on devices, components or assemblies when it is certain that the devices
are disconnected from the power supply and electrical charges stored in the components inside the device have
been discharged.
Live cables or wires to which the device or an assembly is connected, must always be tested for insulation faults or
breaks.
If an error is detected in the supply line, the device must be immediately taken out of operation until the faulty cable
has been replaced.
When using components or modules it is absolutely necessary to comply with the requirements set out in the
accompanying description specifications for electrical quantities.
If the available description is not clear to the non-commercial end-user what the applicable electrical characteristics
for a part or assembly are, how to connect an external circuit, which external components or additional devices can
be connected or which values these external components may have, a qualified electrician must be consulted.
It must be examined generally before the commissioning of a device, whether this device or module is basically
suitable for the application in which it is to be used.
In case of doubt, consultation with experts or the manufacturer of the components used is absolutely necessary.
For operational and connection errors outside of our control, we assume no liability of any kind for any resulting
damage.
Kits should be returned without their housing when not functional with an exact error description and the
accompanying instructions. Without an error description it is not possible to repair. For time-consuming assembly or
disassembly of cases charges will be invoiced.
During installation and handling of components which later have mains potential on their parts, the relevant VDE
regulations must be observed.
Devices that are to be operated at a voltage greater than 35 VDC / 12mA, may only be connected by a qualified
electrician and put into operation.
Commissioning may only be realized if the circuit is built into a contact proof housing.
If measurements with an open housing are unavoidable, for safety reasons an isolating transformer must be
installed upstream or a suitable power supply can be used.
After installation the required tests according to DGUV / regulation 3 (German statutory accident insurance,
https://en.wikipedia.org/wiki/German_Statutory_Accident_Insurance) must be carried out.
All rights reserved. Reproduction as well as electronic duplication of this user guide, complete or in part, requires the written consent of
ESERA GmbH. Errors and technical modification subject to change. ESERA GmbH, ESERA-Automation 2020
www.esera.de
11211 V2.0 R1.0 Manual
Page 6 of 7