ESI KATA-GM-SLV Kurulum Talimatları Kılavuzu - Sayfa 4

Raflar ve Standlar ESI KATA-GM-SLV için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. ESI KATA-GM-SLV 12 sayfaları. Monitor arm

Kata
If using optional grommet mounting method:
• Replace step 1 with step A on page 10. Then proceed to step 2.
Step #1: clamp base assembly to worksurface
The thickness of the worksurface must be between ½" and 1½".
• Loosen the clamp sufficiently to be able to slide it easily onto the
worksurface.
• Clamp the assembly to the worksurface in the desired position.
Be sure to tighten the clamp securely.
Step #2: put the arm into the base
Press down firmly to ensure the arm is fully installed into the base.
clamp to
worksurface
Note direction
Page 4
Assembly
½" – 1½"