dji Spreading System 2.0 Kullanım Talimatları Kılavuzu - Sayfa 4

Quadcopterler dji Spreading System 2.0 için çevrimiçi göz atın veya pdf Kullanım Talimatları Kılavuzu indirin. dji Spreading System 2.0 17 sayfaları. Spreading systems

dji Spreading System 2.0 Kullanım Talimatları Kılavuzu
c. Remount the two landing skids using the eight M3×6 screws.
2. For the Spreading System 2.0, there is the option to mount the fender to the spreader. If
mounted, the fender will prevent materials from being spread to the rear of the aircraft.
5 cm
3. Mount the Spreading System to the aircraft.
a. Loosen the four M3 screws on fixing bracket on the left landing gear leg. Next, slide the fixing
bracket to a position 125 mm below the landing gear mounting base as shown below and
tighten the four screws.
b. Lift the spread tank with the mouth of the tank facing towards the rear of the aircraft.
M3
c. Insert the plugs on the left landing gear leg into the mounting holes on the spread tank.
d. Slide the fixing bracket on the right landing gear leg to a position 135 mm below the landing
gear mounting base as shown below, and align the screw holes on the fixing bracket with the
fin on the right side of the spread tank. Tighten the two M3×12 screws, and insert and tighten
one M3×10 (Plus) screw.
2
1
M3×8
© 2020
DJI All Rights Reserved.
5