Artic AR-DB16F Kurulum Kılavuzu - Sayfa 10

Ağ Donanımı Artic AR-DB16F için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Artic AR-DB16F 10 sayfaları. Fiber access terminal closure

PICTURE 16
5.7.5 Cover the splice tray cover and put back the tool on the tray cover.
5.8 Soft cable port working procedure
5.8.1 For pre-terminated cable, first, insert the drop cable to pass through the box into the 
cable hole, inserting rubber plug and transparent fixture. Then pull out the appropriate length 
of cable, to remain suitable to add a fast connector. Closing the transparent fixture. And finally, 
plugging the rubber plug and the fixture together into the box into the cable hole.
PICTURE 17
5.9 Close the fiberclosure
5.9.1 Close the closure and close the Two buckles, also tighten the bolts.
10
INSTALLATION MANUAL FIBER ACCESS TERMINAL CLOSURE AR-DB16F