Custom Dynamics PROBEAM PB-SS-KIT2 Hızlı Başlangıç Kılavuzu - Sayfa 3
Motosiklet Aksesuarları Custom Dynamics PROBEAM PB-SS-KIT2 için çevrimiçi göz atın veya pdf Hızlı Başlangıç Kılavuzu indirin. Custom Dynamics PROBEAM PB-SS-KIT2 3 sayfaları.
GEN2-SSHD Installation:
1. Make sure bike power is off.
2. Locate stock connector block for taillight/turn signals under the seat. If a Run/Brake/Turn module is in-
stalled, the Signal Stabilizer™ MUST go before the Run/Brake/Turn module. Run/Brake/Turn module
must be compatible with the Signal Stabilizer™ to insure proper operation.
3. Unplug main harness connector from fender harness connector.
4. Plug Signal Stabilizer™ in between these two connectors.
5. Before turning power on, make sure the load switch on the side of the stabilizer is in the "normal" posi-
tion. (Diagram below).
6. Turn the key on and perform a turn signal synchronization. With the key in the run position and the mo-
tor off, press the right turn signal button and allow the turn signal to flash 2 times, after the second flash
press the left turn signal button and allow the turn signal to flash 2 times, after the second flash press the
right turn signal and allow it to flash at least 10 times. Turn key off.
7. Turn key on and test turn signal, running lights, and brake lights for proper operation. If you experience
fast flashing from the turn signals, turn the key off, move the recessed switch on the side of the stabilizer
to the "high" position (see diagram on next page), use a small screwdriver or similar object to move the
switch. Repeat steps 6 & 7.
8. Test Alarm for proper operation, if equipped.
Installation Instructions - Page 3
Signal Stabilizer™ Load Switch Diagram
Custom Dynamics®
Load Switch
Wires
Figure 2
Questions? Call us at: 1 (800) 382-1388 M-TH 8:30AM-5:30PM / FR 9:30AM-5:30PM EST
Up
Position:
(Away
from wires)
Normal
Load
Down
Position:
(Toward
wires)
High Load
10-2018